Diagram Alir Proses Penelitian Dari model tersebut. We invite all lecturers, postgraduate students and researchers to contribute for manuscript submission. Jurnal Desain Interior Tidak Validasi dan Reliabilitas Data yang diperoleh Ya Pengolahan data menggunakan Crosstabs Uji Hipotesis Uji beda dan signifikansi dengan SPSS 13.00 Kesimpulan dan Saran Gambar 1. AVIA has a strong partnership with MIMEC UTM, ICASA ITB, IC-STAR Unila, AVINER Unsurya, and open a collaboration opportunity for publication with other international conference organizers. The publication schedule is planned to be two times per year: June and December. AVIA topics are including, but limited to: aviation sciences and technology, aerospace engineering, aeronautics, defence system and engineering, mechanical engineering, and electrical engineering. Also, general engineering papers related to Aviation and Aeronautical are also welcome. International Journal of Aviation Science and Engineering accept original articles and critical review manuscript in the field of Aviation Science and Engineering, Mechanical Engineering and Electrical Engineering. 3 Issue 2, December 2021 AVIA will broader its aim and scope. AVIA : International Journal of Aviation Science and Engineering is published by Faculty of Mechanical and Aerospace Engineering, FTMD Institut Teknologi Bandung, in cooperation with Faculty of Engineering, Universitas Lampung and Java Scientific Academy, Indonesia.įollowing with the high demand on the scientific publication among the Indonesian lecturer and researches in the field of engineering science and technology, start from the next issue, i.e., Vol.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |